Aug 03 2009

免费000-815题库分享

最新的000-815题库资料

科目代码: 000-815
问题数量: 120

更新时间: 2009-09-03
报名地点: Prometric/Pearson VUE
考试全称: ibm e-business solution design

000-815考试是IBM公司的ibm e-business solution design认证考试官方代号,Examsoon的000-815权威考试题库软件是IBM认证厂商的授权产品,Examsoon 绝对保证第一次参加000-815考试的考生即可顺利通过!

Examsoon 的优势

1.Examsoon 模拟测试题具有最高的专业技术含量,只供具有相关专业知识的专家和学者学习和研究之用。
2.该测试已取得试题持有者和第三方的授权,我们深信IT业的专业人员和经理人有能力保证被授权产品的质量。
3.如果你使用 Examsoon 模拟测试,我们将保证你的第一次参加考试即取得成功,否则,我们将全额退款!
4.提供每种产品免费测试。在您决定购买之前,请检测联接,可能存在的问题及试题质量和适用性.

000-815题库问题与答案赏析

 
 
Exam : IBM 000-815
Title : IBM E-Business Solution Design

1. What can the solution designer do to ensure the proposal meets or exceeds the customer expectations?
A. Commit to a brand solution
B. Ensure that the designed solution is the lowest cost proposal
C. Ensure the proposal addresses the business and technical criteria for evaluation
D. Focus on the newest technologies that can be used to implement the customer solution
Answer: C

2. A customer’s Request for Proposal (RFP) includes a specified high level of availability for e-mail servers in a collaboration solution. The solution designer’s proposal includes not only redundant server hardware, but also Tivoli performance and availability management software for the e-mail servers.
In which two ways does the addition of this Tivoli software ensure that the proposal meets the customer’s business requirement? (Select two answers.)
A. It monitors critical application processes
B. It provides backup for networking hardware
C. It provides failover if one server box goes down
D. It offloads e-mail storage processing to a SAN
E. It enables management of server components that may affect e-mail service
Answer: AE

3. During the proposal process the solution designer recommends the use of an operating system for which the customer has no expertise. However, the customer insists that they are not willing to hire or train new personnel. What is the recommended next step for the solution designer?
A. Insist on implementing the solution as designed
B. Point out the number of other customers implementing this solution on the recommended operating system
C. Suggest that the system administrators can call customer support when problems arise with the proposed solution
D. Provide an alternative design, including relative costs, advantages, and disadvantages, on the customer’s preferred operating system
Answer: D

4. What can be used to determine whether the implemented e-business solution works the way the customer expects?
A. Unit test
B. Usability test
C. GUI design test
D. Acceptance test
Answer: D

5. Each payment request received by a credit card company is checked for completeness, authenticated, and finally applied against online systems. The solution designer was brought in to review the current system for broad scalability, and has recommended implementation of a Transaction Process Monitor to manage the payment request workflow.
What is the benefit of this recommendation?
A. To optimize queuing between the credit card company and merchants
B. To allow better coordination between the various business processes
C. To optimize resource usage between the credit card company and merchants
D. To monitor the throughput between the application server and the database server
Answer: C

6. A retail company hosts a Web site that is not integrated with its legacy proprietary fulfillment system. Employees are required to reenter orders from the Web site into the procurement system to get the warehouse to ship the ordered products. What e-business solution can be used to automate this process?
A. A business intelligence system
B. A supply chain management system
C. An integrated order processing system
D. An enterprise resource management system
Answer: C

7. What is the final step that should be taken when implementing an e-business solution?
A. Provide requirements for proof of concept
B. Establish acceptance criteria and project end point
C. Justify the business value of the e-business solution
D. Verify that the e-business solution meets customer requirements
Answer: D

8. In a cost-saving analysis, what alternative design element should be considered in a knowledge management e-business application?
A. Eliminating Storage Area Networks (SAN)
B. Implementing Storage Area Networks (SAN)
C. Eliminating extra capacity staging area for legacy data
D. Implementing extra capacity staging area for legacy data
Answer: C

9. When creating new e-business applications, many companies mistakenly take a short-term view and tend to overlook long-term costs. What should the solution designer consider to avoid this common mistake?
A. Hardware costs
B. Software costs
C. Code maintenance
D. Development costs
Answer: C

10. If a solution designer is asked by a project manager and sales person for assistance, what request is NOT the responsibility of the Solution Designer?
A. Prepare the Statement of Work
B. Assist with establishing acceptance criteria
C. Highlight the potential risk to the project introduced by design factors
D. Establish rough estimates of the time and resources (people and technology) required
Answer: A

11. As the e-business solution is being implemented, the team is having difficulty getting the user profile (authentication and authorization) information from individual applications. What technical guidance should the solution designer provide to the team?
A. Develop an enterprise-wide LDAP directory of users and their access permissions
B. Create new systems that use authentication techniques that are not based on user ID and password
C. Create individual authentication and authorization functionality for each and every application
D. Users should remember multiple ID and password combinations to promote the highest level of security
Answer: A

12. What test would mark the end of a successful e-business project?
A. Unit test
B. Component test
C. Acceptance test
D. System integration test
Answer: C

13. Why should the solution designer remain on the project after the project manager has assumed responsibility for the implementation of the solution?
A. To provide technical oversight
B. To supervise the project manager
C. To provide the details of the project plan
D. To ensure the technical personnel are performing satisfactorily
Answer: A

14. An e-business solution designer is preparing to assist in the presentation of the solution proposal. What is the most important aspect to focus on to ensure customer approval?
A. Explain the ability of the new system to scale and change
B. Map the technical solution to the customer’s business requirements
C. Map the differences between the current workflow and proposed workflow
D. Explain the total cost of ownership by taking support and training into consideration
Answer: B

免费下载000-815认证考题Demo

免费下载000-815 PDF题库

000-815考试是IBM厂商最热门的科目,其考试的全称为:ibm e-business solution design。在此我们收集了不同题库供应商的真题集 包含 : examsoon 000-815培训资料 ,Testinside 000-815考题讲解, Pass4sure 000-815题库 , Testking 000-815考试指南, exam4sure 真题材料.只要仔细阅读以下的000-815题库demo的问题和答案, 相信你就会知道这个题库的质量了。

000-815题库由多位IT认证的专家亲自整理的考试全真试题材料,为了让大家花更少的时间来完成IBM 000-815考试. examsoon考题大师000-815试题都是考试原题的完美组合,覆盖率95%以上,答案由多位专业资深讲师原版破解得出,正确率100%,只要您使用本站的考试题库参加000-815考试,我们保证您一次轻松通过考试;

No Comments

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a comment

You must be logged in to post a comment.