Aug 03 2009

免费000-990题库分享

最新的000-990题库资料

科目代码: 000-990
问题数量: 128

更新时间: 2009-09-16
报名地点: Prometric/Pearson VUE
考试全称: Test 990, IBM WebSphere Bus Modeler Adv V6.0, Bus Anl+Design

000-990考试是IBM公司的Test 990, IBM WebSphere Bus Modeler Adv V6.0, Bus Anl+Design认证考试官方代号,Examsoon的000-990权威考试题库软件是IBM认证厂商的授权产品,Examsoon 绝对保证第一次参加000-990考试的考生即可顺利通过!

Examsoon 的优势

1.Examsoon 模拟测试题具有最高的专业技术含量,只供具有相关专业知识的专家和学者学习和研究之用。
2.该测试已取得试题持有者和第三方的授权,我们深信IT业的专业人员和经理人有能力保证被授权产品的质量。
3.如果你使用 Examsoon 模拟测试,我们将保证你的第一次参加考试即取得成功,否则,我们将全额退款!
4.提供每种产品免费测试。在您决定购买之前,请检测联接,可能存在的问题及试题质量和适用性.

000-990题库问题与答案赏析

 
 
Exam : IBM 000-990
Title : Test 990, IBM WebSphere Bus Modeler Adv V6.0, Bus Anl+Design

1. Click the Exhibit button.
A simulation is run on the process shown in the diagram. The results of 100 tokens being passed in the simulation is also shown. Which of the following is true based upon the simulation results?
A. The simulation engine did not successfully complete processing of all 100 tokens.
B. The decision is being made inclusively.
C. The simulation engine is not distributing the tokens as the percentages on the branches of the decision indicate
D. Task 2,3,4 are not executing simultaneously.
Answer: D

2. Which of the following is the BEST approach for comparing the performance of different versions of the same process model?
A. Use the change management repository, and run a compare to determine the changes from the older to the newer.
B. Use the change management repository, and activate the comparison analysis.
C. Use the simulation results from the two versions of the same process model, and run the comparative analysis from static analysis.
D. Use the simulation results from the two versions, and activate the comparison analysis from dynamic analysis.
Answer: D

3. Activity throughput analysis provides the capability to analyze the production capability of an activity, which is the amount of work each activity can perform for a given period of time. The throughput analysis provides each of the following, EXCEPT:
A. the maximum attainable throughput for the activity if all available quantities of this bulk resource or role in the project are assigned to this activity.
B. any notes generated by the analysis relating to the requirement.
C. the maximum sustainable throughput for the activity based on the highest value calculated for Throughput or Maximum Throughput Due to Resource or Role.
D. the maximum throughput for the activity based on the highest value calculated for Throughput or Maximum Throughput Due to Resource or Role.
Answer: C

4. Click the Exhibit button.
A simulation has been set to run 100 tokens. When reviewing results, it appears that the simulation has counted 200 tokens for the task "Route Application." The doubling of the tokens was caused by "AND" statements (rather than an "OR" statement) for the output of the Process "Receive Application from Agent" and the input for "Process Applications." Once this has been corrected, what else must be changed for the process to run correctly?
A. Set the two Stop Nodes in "Receive Application from Agent" to End Nodes.
B. Set the "Method of Selecting an output Path" to "Based on an expression" in the General Tab of the simulation snapshot attributes.
C. Set the input logic for the task "Route Application" to "OR" rather than "AND."
D. Replace the Join with a Merge object.
Answer: D

5. To validate a process model, an analyst sets up simulation for 100 tokens to be passed into a process. The task chart can be used to determine which of the following?
A. The distributions and the total instances that each task has been hit.
B. The total instances that each task has been hit and the average duration of each instance.
C. The distributions and the path of each token per instance activation.
D. The total instances and the instances a token was routed from one path to the next.
Answer: A

6. An analyst would like to calculate the average duration of a select set of non-contiguous tasks in a linear process. Which of the following is the quickest, most accurate method to get this information over several simulation runs?
A. Use the simulation results to get the average duration of each of the selected tasks and manually sum them.
B. Run the process activities total time report.
C. Set classifiers on selected tasks and run the process classifier cost and duration report.
D. Run the activity duration report and add selected task durations manually.
Answer: C

7. An analyst is reviewing a process model and wants to validate that every task has resources assigned to it. To accelerate the validation, the analyst chooses to use the Swimlane layout functionality. After viewing the appropriate Swimlane layouts, the analyst incorrectly assumes the model is incomplete because various tasks fall in the Unassigned lane. Given that every task has a resource assigned to it, which statement accurately disproves the analysts assumption?
A. The Swimlane functionality only supports lanes defined by individual resources.
B. The Swimlane functionality only supports lanes defined by bulk resources.
C. Resources must be assigned to a tasks role to show as a Swimlane.
D. Individual and bulk resources cannot be viewed simultaneously in the same Swimlane layout.
Answer: D

8. Click the Exhibit button.
Each task in the process has the same processing time. Each task is accomplished with the same individual resource. In the Save Records task, the time required of the resource exceeds the processing time. In the Update Information task, the resources time required equals the processing time. Given the simulation results, which two of the following measures remain constant during the running of the process simulation?
A. Shortage duration
B. Elapsed duration
C. Delay duration
D. Working duration
E. Allocation duration
Answer: DE

9. A fire department is trying to project costs for the coming year. They know that a business analyst has built a business model for processing emergencies. There is a requirement for 3 Emergency Medical Technicians (EMTs) to be available 24 hours each day. The department wants to know what the cost of the EMTs will be. The business analyst can help the department by providing which of the following reports?
A. Dynamic Analysis – Process Cost Report
B. Dynamic Analysis – Process Resource Allocation Report
C. Static Analysis – Resource Cost Report
D. Static Analysis – Activity Cost and Duration
Answer: C

10. Click the Exhibit button.
The exhibit shows the task list for a simulation that was run with 10 tokens. Notice the note "Simulation finished but all tasks were not completed." The dialogue below appears when the details link is selected. Only one token passed through the first task and then Task:3. Then the simulation apparently halted and then timed out. The BEST solution to this problem would be which of the following?
A. Resolve inconsistencies in the Data Model.
B. Add a merge to join the paths through Task:2 and Task:3.
C. Modify the input criteria of Task:4 to use OR instead of AND.
D. Apply user input that the simulation is waiting for.
Answer: C

11. To properly model a business process, several models are required. These include Organization, Process, Data and Resource models. When approaching the resource model, the analyst must keep in mind that the resource model does which of the following?
A. Defines the resource types and instances associated to the model
B. Defines the view of resources used within a business process
C. Defines and identifies the structure of associated resources
D. Defines resource utilization levels, as well as cost and cycle time calculations
Answer: A

12. A business analyst redesigned a model, ran a simulation, and completed analysis for validation. Next, the analyst can use the Process Comparison to:
A. Determine the degrees of improvement for various alternative solutions based on various analyses.
B. Use a spreadsheet to perform additional analyses on key features and attributes of the process model.
C. Determine changes in resource allocation and availability.
D. Determine the versions of the process being compared.
Answer: A

13. Which of the following reports would give the BEST comprehensive evaluation for the cost of a process?
A. Static Analysis Resource Cost
B. Static Analysis Activity Cost and Duration
C. Dynamic Analysis Process Instance Cost
D. Dynamic Analysis Process Cost
Answer: D

14. Click the Exhibit button.
The manufacturing process for a widget is shown in the exhibit. The process consists of 3 steps: drill, bend and de-burr. There is a jig that is required for the drilling task. The output shown in the process instances summary confirms which of the following problems in the process?
A. There are insufficient resources to keep up with manufacturing demand.
B. The tasks must not be sequential.
C. The order of the tasks is incorrect.
D. Bad data modeling practices are causing unexpected process simulation results.
E. The specified duration of each task is too long.
Answer: A

免费下载000-990认证考题Demo

免费下载000-990 PDF题库

000-990考试是IBM厂商最热门的科目,其考试的全称为:Test 990, IBM WebSphere Bus Modeler Adv V6.0, Bus Anl+Design。在此我们收集了不同题库供应商的真题集 包含 : examsoon 000-990培训资料 ,Testinside 000-990考题讲解, Pass4sure 000-990题库 , Testking 000-990考试指南, exam4sure 真题材料.只要仔细阅读以下的000-990题库demo的问题和答案, 相信你就会知道这个题库的质量了。

000-990题库由多位IT认证的专家亲自整理的考试全真试题材料,为了让大家花更少的时间来完成IBM 000-990考试. examsoon考题大师000-990试题都是考试原题的完美组合,覆盖率95%以上,答案由多位专业资深讲师原版破解得出,正确率100%,只要您使用本站的考试题库参加000-990考试,我们保证您一次轻松通过考试;

No Comments

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a comment

You must be logged in to post a comment.